(a) widening and realignment of a 3.6 km section of Tung Chung Road (TCR) between Lung Tseng Tau and Pak Kung Au from a single-lane road for two-way traffic to a single two-lane road for two-way traffic with a footpath having a minimum width of 1.6 m, and construction of a 2.6 km long single two-lane road between Pak Kung Au and Cheung Sha, including elevated highway structures of a total length of 750 m, with a footpath of a minimum width of 1.6 m;
(b) provision of 21 passing bays/bus-bays along the road and a roundabout at Cheung Sha; and
(c) associated works including road rehabilitation, drainage, utility, environmental mitigation measures, landscaping, slope stabilisation, traffic aids, road safety enhancement measures, lighting, traffic control and surveillance system, and electrical and mechanical (E&M) works.
For more information on the Project, please visit Highways Department's Official website:
http://www.hyd.gov.hk/eng/majorworks/tcr/index.htm